Rudolf-Ihm-Bridge, Raunheim, Germany

The delivery and subsequent installation of the stay cables for a bridge in Raunheim was another highlight for PFEIFER in the field of bridge construction.

In the course of this project the newly developed, dynamically loadable fittings Type 700 and Type 710 were installed for the first time. These rope terminations are distinguished by their audited and confirmed fatigue resistance to cyclic loads.

Cookie settings

We use cookies to optimise our web page for you. By continuing to use the web page you agree to the use of cookies. Further information about cookies can be found in our data protection declaration.

Required cookies

Required cookies are mandatory for the basic functions of the website. Without these cookies, you will unfortunately not be able to use our website. These cookies are always set when you use the website. No personal data is collected or stored.

Functional cookies

These cookies allow us to analyze website usage so that we can measure and improve its performance. No personal data is collected or stored.

Data protection declaration